|
at
the back of the machine, pressing it into its place with the springs in
the nylon pins.
Then
the flexible axle, figure B-1, is fixed by the screw, figures C-1 and C-2.
The
gear A-1 has been filled with oil, before packing. Electrical cable to be
connected
according
to instructions and diagram provided.
Remove
the V-belts before controlling rotations of motors.
Please
discard aluminium plate below the A-5 scraper, used only for
transportation purposes.
On
figure D please find function of switches.
Topheating
D-4 works with thermostat A-2.
Thermostat
D-1 is generally adjusted around 36°C.
Thermostat
A-2 is
generally adjusted around at 34°
- 38°C.
A
very exact tuning of thermostats in relation to each other and to room
temperature may be obtained (excluding possible drafts), providing
constant heating suitable for the chocolate being used.
Adjustment
The
chocolate tunnel A-3 may be adjusted and, together with the adjustment of
the
speed
of the wheel (B-3), practically any chocolate production requirement can
be covered. B-4 adjusts the intensity of the shaker.
Moulds
Round
or irregular moulds (for
Easter eggs etc.) (mostly single moulds) are just to be kept under the
chocolate tunnel A-3 for a second (or perhaps half a second) before being
placed on the vibrating table.
Ordinary
moulds - square or rectangular - with vertical sides are being filled and
scraped by the special apparatus for this purpose. The side pieces with
side-scrapers are being placed apart from each other according to width of
moulds (easily made by hand without any tools).
The
top-scraper A-5 may be adjusted in 7 steps by the weights placed and may
be turned 180 horizontally. The chocolate delivery is adjusted by A-3. Now
push the moulds through the apparatus, lifting A-5 at level with the first
mould, pushing one mould by the one following. The moulds are going
directly to the vibrator.
For
hollow articles place moulds up-side down on the vibrator, and surplus
chocolate will run into the vessel. For closing hollow articles at bottom
use the machine once more. Don't forget the weights on A-5 to make bottom
flat, convex or concave.
Lubrication
The
gear is to be refilled with oil once or twice a year according to use of
the
machine,
and also the chain B-5 is to be lubricated.
The
V-belt pulleys of the motors are to be carefully lubricated every month,
or
depending
on usage of machine. (See oil scheme).
Gears
and motor are factory filled with
Shell Simnia Grease 0. Initial fill will last for
about
8,000 operating hours at temperatures ranging between + 20°C
to - 80°C.
Before
re-fuelling clean gear casing thoroughly.

Vario-Pulley
|